Funding entity Fundación Iberdrola España
In this research project it is developed a stochastic model to improve the resiliency of large-scale distribution networks using micro-grids, while minimizing the cost of the installations. A multi-objective optimization is implemented. The investment candates are power line undergrounding, photovoltaics, batteries and smart switches. Stochasticity enables to enhance the model in order to prevent harmful events, and their consequences, such as multiple simultaneous failures.
Iberdrola-2020